The Building

Kwinana Power Station, which is located in an industrial suburb of Perth, supplied energy to parts of Western Australia between 1970 and 2015. The facility used four turbines driven by steam from boilers fired by coal and natural gas, and had a capacity of 420 MW (2015). 

Kwinana was fully retired in October 2015 after the State Government announced the final phase of decommissioning.

The Project  

A major industrial demolition and remediation project of the Kwinana site commenced in 2017. The scope of works includes demolition of a 140-metre chimney stack and adjacent boiler house structure down to foundation levels.

Waco Kwikform was engaged to supply access scaffolding to encapsulate these structures to allow removal of contaminants. 
A total of 3800 tonnes of scaffolding was supplied and erected.  

Waco Kwikform

Latest News See All

Waco Response to COVID 19

19 Mar 2020

Waco Kwikform Ltd's response to the COVID-19 pandemic.

Read More

New Location for Waco Kwikform Brisbane

16 Jan 2020

Our Brisbane branch has relocated to a larger, more flexible office space in Berrinba. We look forward to seeing you at our new premises.

Read More

Contact Us /Branches

Head Office
Suite 2.02, Level 2
3 Rider Blvd 
RHODES NSW 2138

Ph: (02) 8399 9100
Fx: (02) 8399 9198
E: headoffice@wacokwikform.com.au

See All Branches